Sany 56m concrete pump truck is working on the construction site.( Central Asia)

Sany 56m concrete pump truck is workingon the construction site.( Central
Asia)

1

Sany 62m Concrete Pump Supply for a Saudi Arabian Construction Project

Client Background

A leading construction contractor in Saudi Arabia was undertaking a large-scale commercial complex project, requiring a high-performance 62m concrete pump to meet the high-rise building’s concrete pouring needs. The client demanded reliable equipment that could adapt to the local high-temperature environment and strict construction standards.

Challenge

– Source a Sany 62m concrete pump with stable performance in high-temperature (40℃+) conditions

– Ensure the equipment meets Saudi Arabian construction safety and quality certification requirements

– Deliver the equipment within 45 days to avoid project delays

– Provide on-site technical support and spare parts supply for long-term operation

Mechabro Solution

We tailored a targeted solution based on the client’s regional and project needs:

1. Sourced a low-hour, pre-owned Sany 62m concrete pump with a complete service history, specially inspected for high-temperature resistance of hydraulic and electrical systems.

2. Conducted custom upgrades: optimized the cooling system to adapt to Saudi Arabia’s high-temperature environment, and completed all local safety certification and inspection procedures.

3. Arranged fast shipping logistics, ensuring the equipment arrived at the job site within 40 days, ahead of the scheduled deadline.

4. Sent 2 professional technical engineers to the site for equipment commissioning, operator training, and provided a 12-month warranty and localized spare parts supply.

Results

– The Sany 62m concrete pump operated stably in high-temperature conditions, with 99.7% uptime during the entire concrete pouring phase.

– 40% cost savings compared to purchasing a new unit, saving the client $850,000 in equipment investment.

– The project’s high-rise concrete pouring was completed 10 days ahead of schedule, winning high recognition from the client.

– Secured a long-term cooperation agreement, becoming the client’s designated supplier for concrete machinery in Saudi Arabia.