To ensure the efficient operation of the 混凝土泵车 boom system and extend the service life of key components, it is recommended to lubricate and maintain the grease filling points of the boom, support legs, and chassis every 15 days to ensure that the moving parts such as the pin shaft and connecting rod maintain the best working condition.
Standardized operation process for butter filling
1.Site preparation: Choose an open and flat work site, support the concrete pump truck horizontally and firmly, fully deploy all booms to a horizontal extension state, and create safe and convenient operating conditions for lubrication operations.
2. Standardized oiling: Apply butter to each lubrication point of the arm frame in a step-by-step manner. When fresh butter is observed overflowing from the bearing area and the old oil is fully discharged, it indicates that the lubrication point has reached saturation and the next point operation can be carried out.

Key reminder: For lubrication points equipped with standard grease fittings (as shown in the figure below), it is necessary to strictly follow the filling cycle of once every 15 days to avoid lubrication failure.

Potential risk warning of lubrication deficiency
1. Efficiency loss: Insufficient lubrication will significantly increase the resistance of moving parts, causing abnormal friction noise and slow response of the boom, directly leading to a decrease in construction efficiency and delaying project progress.
2. Structural damage: Continuous lack of lubrication can accelerate the wear of the pin shaft and shaft sleeve, and in severe cases, may cause the pin shaft to break, leading to the failure of the boom structure and causing major safety accidents.
3. Fatigue failure: Stress concentration caused by poor lubrication in the hinge area can easily lead to metal fatigue, causing cracks or even fractures in key components, resulting in irreparable structural damage.
By strictly implementing the lubrication and maintenance system, the failure rate of concrete pump trucks can be effectively reduced, ensuring operational safety and achieving sustainable optimization of their performance.
新闻:
Recently, the installation part of the concrete remanufacturing pump truckcarefully crafted by Hunan Mecha Brothers Technology Co., Ltd. has completed the loading operation and is about to sail to the international market.

The upcoming shipment of the upper products has undergone multiple rigorous testing processes, achieving comprehensive optimization of performance and reaching international advanced levels in energy consumption, stability, and other aspects, fully demonstrating the enterprise’s ultimate pursuit of quality.

In the future, the company will continue to focus on technological innovation, enhance product competitiveness, and explore international markets with higher quality products and services, contributing to the development of China’s second-hand construction machinery foreign trade industry.
关于我们:

本公司是一家专业从事二手机械贸易的公司,拥有一支专业的技术团队。我们秉承“诚信经营、品质至上、互利共赢”的理念,助力客户在国际市场上取得成功。.