Our customers from Central Asia gave us a thumbs up

Custom Refurbished Crane for a High-Rise Construction Company
Client Background
A commercial construction company specializing in skyscraper projects needed a 80-ton tower crane for a 2-year high-rise development. New units had a 8-month lead time and a $2.2M price tag, which would delay the project’s critical timeline.
Challenge
- Source a fully functional 80-ton tower crane with a 45-day delivery window
- Ensure the equipment meets strict high-rise construction safety standards
- Provide a cost-effective alternative to new equipment
- Offer comprehensive after-sales support and operator training
Mechabro Solution
Our engineering team executed a precision custom refurbishment project:
- Sourced a low-hour, pre-owned 80-ton tower crane from a trusted fleet with a complete service history
- Completed a full custom rebuild: replaced all critical structural components, upgraded the hoist and control system, and performed a full load test
- Conducted 20+ rigorous safety and performance tests to comply with international construction standards
- Provided a 18-month extended warranty, 24/7 on-site technical support, and certified operator training
Results
- 52% cost savings vs. purchasing a new unit, saving the client $1.14M
- 40-day delivery (vs. 8-month lead time for new equipment), enabling the project to start on schedule
- 100% safety compliance and reliability throughout the 2-year high-rise construction
- Client awarded Mechabro the exclusive crane supply contract for all their future high-rise projects