Custom Refurbished Crane for a High-Rise Construction Company

Client Background

A commercial construction company specializing in skyscraper projects needed a 80-ton tower crane for a 2-year high-rise development. New units had a 8-month lead time and a $2.2M price tag, which would delay the project’s critical timeline.

Challenge

  • Source a fully functional 80-ton tower crane with a 45-day delivery window
  • Ensure the equipment meets strict high-rise construction safety standards
  • Provide a cost-effective alternative to new equipment
  • Offer comprehensive after-sales support and operator training

Mechabro Solution

Our engineering team executed a precision custom refurbishment project:

  1. Sourced a low-hour, pre-owned 80-ton tower crane from a trusted fleet with a complete service history
  2. Completed a full custom rebuild: replaced all critical structural components, upgraded the hoist and control system, and performed a full load test
  3. Conducted 20+ rigorous safety and performance tests to comply with international construction standards
  4. Provided a 18-month extended warranty, 24/7 on-site technical support, and certified operator training

Results

  • 52% cost savings vs. purchasing a new unit, saving the client $1.14M
  • 40-day delivery (vs. 8-month lead time for new equipment), enabling the project to start on schedule
  • 100% safety compliance and reliability throughout the 2-year high-rise construction
  • Client awarded Mechabro the exclusive crane supply contract for all their future high-rise projects