The Structure Of Concrete Pump Truck

The structure of a  concrete pump truck is basically divided into five components: chassis, boom system, pumping system, hydraulic system and electronic control system (see the figure below).
NO.1 Pump Truck ChassisThe chassis ...

The structure of a  concrete pump truck is basically divided into five components: chassis, boom system, pumping system, hydraulic system and electronic control system (see the figure below).

1

NO.1 Pump Truck Chassis

When comparing a used concrete pump truck, record the installed chassis make, model, axle configuration and engine specification from that machine's identification plates and documents. Match the pump model to its own data sheet and operating instructions rather than selecting a chassis from a general brand list. SANY's current 56-60 m pump page shows one specified chassis and engine combination; it is not a specification for every SANY pump.

(1)Transfer Case

For a used pump, request a machine-specific description of how engine power is supplied to the vehicle drive and pumping equipment. Identify the installed transfer case or power take-off arrangement from the corresponding documentation. Follow the exact machine's procedures when changing operating modes; see the VDMA Safety Manual, section 1.6.1. Treat the illustration as a component overview, not a repair or assembly instruction.

2

Transfer case structure

3

(2)Transmission Shaft

Before ordering a replacement drive shaft, identify its application, the exact assembly and its matching parts-catalogue reference. The following information helps a supplier review a proposed replacement:

1. Request the specified shaft length and measurement convention from the matching drawing or parts catalogue. Have any removal and measurement work carried out by qualified personnel under the machine's maintenance instructions; see the VDMA Safety Manual, section 3.1.

2. Confirm the flange and coupling specification from the matching assembly drawing, including the units for each dimension. Ask the parts supplier to check the complete specification rather than choosing a replacement from a hole count or generic flange-type name alone.

Tip: Provide legible photographs of the shaft identification marks together with the relevant catalogue or drawing reference. Ask the parts supplier to match the identification to the exact assembly before confirming a replacement.

4

No.2 Boom System

The boom assembly carries the delivery pipeline and positions the end hose for concrete placement. It is mounted on a slewing turret, while hinged boom sections extend and fold within their specified limits. Rotation and articulation depend on the exact pump model. For procurement, compare the manufacturer's reach diagram, minimum unfolding space and required outrigger spread; see SANY's truck-mounted pump specifications as a model-specific example.

5

(1)Boom assembly

The function of the boom assembly is to deliver the concrete pumped by the pumping mechanism directly to the pouring position indicated by the end of the boom through the delivery pipe attached to the boom through the extension and rotation of the boom, to realize the delivery and distribution of concrete.

(2)Turret

The turret and slewing mechanism support the boom assembly and connect it to the truck superstructure. The outrigger system provides the base required for permitted boom movements. Check the machine's working diagram, setup instructions and prohibited working areas before choosing its placement position. A reach diagram does not mean every point can be used safely; see the VDMA Safety Manual, section 2.5.1.

6

(3) Fixed turret

Identify the hydraulic-fluid reservoir and cleaning-water tank from the markings and layout drawing for the exact machine. Confirm the fill points and maintenance instructions before servicing; do not infer tank function from whether it appears on the left or right of an illustration. Consult the VDMA Safety Manual, section 1.6.1 and the corresponding machine instructions.

7

(4)Outrigger support

The function of the outrigger is to stably support the entire vehicle on the ground and directly bear the load torque and weight of the entire vehicle.

8

NO.3 The Hydraulic System

The hydraulic system of the pump truck consists of a pumping hydraulic system and a boom hydraulic system.

Hydraulic components

(1)Hydraulic oil

Use the hydraulic fluid grade and operating-temperature limits specified for the exact machine. The oil, filter and tank-maintenance schedule must follow its operating instructions; ask for dated service records when assessing a used pump. Putzmeister's approved-fluids brochure shows that requirements vary with fluid type and viscosity grade. The VDMA Safety Manual, section 3.1 requires compliance with the machine's maintenance and inspection intervals.

(2)Hydraulic oil tank

The reservoir holds hydraulic fluid. For a used pump, request its oil and filter service records and check the maintenance instructions before any reservoir inspection or cleaning. Reservoir work and hydraulic-system maintenance must be carried out by qualified personnel following the machine's instructions; see the VDMA Safety Manual, section 3.1.

(3)High-pressure filter

(4)Pressure gauge

(5)Accumulator

The role of the accumulator: storing energy and maintaining pressure, replenishing oil to the system as an emergency energy source, absorbing pressure shock or pulsation, reducing vibration and noise, etc.

(6)Oil pump, motor

(7)Multi-way valve

(8)Air cooler

(9)Identification of hose accessories

No.4 The Electric Control System

The electric control system of the  concrete pump truck  consists of an electric control box, an operation panel, a remote controller, etc. The operation panel consists of three parts: a local control panel, a remote control panel, and a cab control panel.

9

No.5 The pumping system

The pumping system is the actuator of the concrete pump truck, which is used to continuously transport concrete along the delivery pipeline to the pouring site. The pumping system consists of the hopper assembly, pumping mechanism, delivery pipeline and lubrication system. The structure of the pumping mechanism is mainly composed of concrete piston assembly, main oil cylinder, delivery cylinder, washing chamber, tie rod and other parts.

10

To compare boom reach, chassis and inspection points before purchase, see our concrete pump truck selection guide.

REQUEST A QUOTE FOR AN USED PUMP FROM MECHA BROTHERS TECHNOLOGY

Having more than 15 years experiences, MECHA BROTHERS TECHNOLOGY has provided high-quality concrete pumps from CHINA. Our company offers competitive prices , unique custom refurbishment service, timely and effective after-sales serve your needs. If you need help buying a concrete pump, MECHA BROTHERS TECHNOLOGY is here for you.

Share your love

Leave a Reply

Your email address will not be published. Required fields are marked *